Nailing instructions lp smartside 76 series lap siding may be attached directly to framing members spaced up to a maximum of 24 in.
Lp smartside vertical siding installation instructions.
Prefinished lap joint siding.
Lp smartside siding is not designed and or manufactured to be used as trim or fascia.
Trim install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
Trim with hidden fastener system.
Step 1 hold the metal.
Backer rod may be required by the sealant manufacturer.
Lp smartside lap siding installation using h molding.
Roof edge up to the eave edge of the roof line.
Lp smartside trim and fascia are available in a variety of dimensions.
When using smartside siding with other siding products like stucco brick or cultured stone veneers it is important to use a capillary break so moisture absorbed into those veneers cannot be transferred into siding.
Nailing instructions lp smartside 38 series lap siding may be attached directly to framing members spaced a maximum of 16 inches 406 mm o c.
We ll also review the proper tools needed and.
Tn 028 vertical siding.
How to install lp smartside trim siding.
Check your local building code before starting to install the sid.
Separate smartside siding from veneers with minimum 3 8 inch 10 mm space for horizontal or vertical joints use sealant.
Download our helpful installation instructions and watch our informative how to videos.
Lp smartside precision series lap siding installation instructions.
Board and batten with vertical panel siding.
Lp smartside 38 series lap siding may be attached directly to framing members that are spaced up to a maximum of 16 in.
Keep the top edge of the metal on the plane of the sheathing slide the metal roof edge up or down the roof until a 5 8 measurement is achieved perpendicularly out from the fascia to the inside of the bend in the metal roof edge.
View all product literature.